Those portions of the design that are not submitted at the time of the application for CONSTRUCTION DOCUMENT approval and that are to be submitted to the department within a specified period of time after the issuance of a permit.
DEFERRED SUBMITTAL
Labels: 0 New NYC Construction Codes, D